This document includes the top 20 recommended checklists for Tranquility Pools. Each checklist is a framework ready for future expansion into customer-facing PDFs, website tools, or onboarding kits.
1. Pool Planning & Pre‑Purchase Checklists #
Checklist 1 – Pool Planning Checklist (Before You Get a Quote) #
• Measure backyard width, length, and available space
• Check access for machinery and delivery vehicles
• Identify obstructions (septic, sewer lines, power, sheds)
• Assess soil/drainage issues
• Review retaining wall requirements
• Establish realistic project budget
• Identify preferred pool purpose (family, fitness, relaxation)
• Choose water type (salt, mineral, AOP)
• Initial equipment preferences (lighting, heating, cleaning)
Checklist 2 – Pool Design Selection Checklist #
• Estimate typical number of swimmers
• Choose preferred step style
• Select bench/sitting zones
• Depth preference (flat/gradient)
• Lap lane or recreation zone?
• Safety ledge requirements
• Shortlist matching pool models
• Align pool orientation with backyard layout
Checklist 3 – Pool Size Decision Checklist #
• Measure available width & length
• Allow for 1m boundary + 1.5m to structures
• Match allowable space to pool size group
• Consider yard shadowing & sunlight
• Confirm compliance with certifier
Checklist 4 – Colour Selection Checklist #
• Preferred backyard style (coastal, modern, minimal)
• Amount of direct sunlight
• Shade impact from house or trees
• Preferred water tone (light, medium, deep blue)
• Match colour to pavers/tiles
• Night lighting considerations
2. Installation & Approvals Checklists #
Checklist 5 – Pre‑Installation Site Preparation Checklist #
• Clear yard completely
• Ensure access is unobstructed
• Secure pets and children
• Relocate vehicles & bins
• Temporary fencing arranged
• Neighbour notification
• Identify materials staging area
Checklist 6 – Council & Approval Checklist (NSW / QLD / VIC) #
• Confirm approval type (CDC/DA/Private Certifier)
• Provide site plan, sewer diagram, survey
• Engineering for footings / bond beam
• Setback compliance
• Stormwater drainage review
• Soil test if required
• Certifier’s final approval
Checklist 7 – Excavation Day Checklist #
• Clear access route
• Remove loose items (pots, toys, furniture)
• Unlock gates
• Secure pets
• Provide parking for trucks
• Notify neighbours
Checklist 8 – Pool Delivery & Crane Lift Checklist #
• Crane access confirmed
• Powerlines clearance verified
• Street parking arranged
• Drop zone prepared
• Communication with crane operator
• Weather checked
Checklist 9 – Handover Day Checklist #
• Pump operation demonstrated
• Filter cleaning process explained
• Sanitiser/Control settings reviewed
• Lighting operation explained
• Water balanced
• Record serial numbers
• Warranty documentation provided
3. DIY Pool Package Checklists #
Checklist 10 – DIY Installation Checklist #
• Pool set-out completed
• Excavation & level confirmed
• Base screed installed
• Pool shell placed
• Plumbing installed
• Pressure-tested
• Backfill & compaction
• Bond beam poured
Checklist 11 – DIY Equipment Setup Checklist #
• Pump connected
• Filter installed
• Sanitiser connected
• Lighting transformer installed
• Heating connected (optional)
• Pressure test completed
• Commission system
Checklist 12 – DIY Handover Checklist #
• Water balance achieved
• Pump schedule set
• Filter maintenance explained
• Lighting tested
• Controller settings saved
• Final inspection completed
4. Equipment & Ownership Checklists #
Checklist 13 – Equipment Selection Checklist #
• Pump type chosen
• Filter type chosen
• Sanitiser chosen
• Heating requirement identified
• Cover & roller included
• Lighting quantity selected
• Equipment housing needs addressed
Checklist 14 – Heating System Sizing & Readiness Checklist #
• Pool length & volume measured
• Cover usage confirmed
• Theralux Inspire heater size selected
• Equipment pad space assessed
• Electrical supply confirmed
• Regional climate considered
Checklist 15 – Pool Cover & Roller Compatibility Checklist #
• Choose above-ground vs underground roller
• Confirm cover thickness
• Check storage location
• Measure roller placement area
• Confirm ease of use
• Check cover shape cut requirements
Checklist 16 – Equipment Housing Checklist #
• Ventilation available
• Noise reduction considered
• Service access clear
• Drainage available
• Sun protection provided
• Equipment clearances respected
5. Maintenance & Troubleshooting Checklists #
Checklist 17 – Weekly/Monthly Maintenance Checklist #
• Brush walls
• Vacuum floor
• Skim surface
• Check pH & chlorine/mineral levels
• Clean/backwash filter
• Inspect pump & equipment
• Check pump timer
Checklist 18 – Seasonal Pool Care Checklist #
• Summer: balance water & increase pump time
• Autumn: leaf control & chemistry adjustment
• Winter: reduce pump time & cover pool
• Spring: shock dose & restart system